Monday, February 25, 2013

11th Hole drainage update

The aim is to install bunker drainage and run the drain line across the fairway into the lake. We firstly marked out the area, looking at the natural contour/sloping of the fairway to see chose the best place to run the line. We then stripped the turf, and started digging the trench from the pond side up to the bunkers, with sufficient fall.

Pops with the sod cutter

The bunkers prior the drainage

The trench

The outlet

A great relief

The next steps are to now install the 6" perforated pipe along with 20mm chippings, and the backfill and turf. Please be aware when playing this hole, as machinery is being used.

Greens will be cut Tuesday morning along with the surrounds. We will also be adding some sand to bunkers where needed, as all bunkers are to be in play on March 1st. For more regular updates add us on facebook.